Our team constructed and tested two 1:65 scale live-bed physical models of the proposed Mid-Barataria Sediment Diversion and the conveyance channel. The project is part of the Coastal Protection and Restoration Authority of Louisiana (CPRA) $2.2 billion plan to construct the 2-mile long Sediment Diversion to divert muddy Mississippi River water into Plaquemines Parish’s degraded wetlands to rebuild land. The hydraulic modeling and testing performed provided important design information related to sedimentation, riprap stability, coffer dam construction, gate testing and other key design parameters to make this concept a reality. Project construction commenced in August 2023.
Selecting alignment of 2.5-mile new roadway while minimizing impacts and cost containment to fall within allotted funding.
Excavation = 1.4M cubic yards, Rock blasting
Six (6) Roundabouts - Five (5) Single Lane, and One (1) Double Lane
Six (6) Span Concrete Bridge, One (1) Single-Span Concrete Bridge
One (1) Box Culvert
Four (4) Rock Structure Habitat created for Eastern Small-Footed Myotis Bats
Seventeen (17) Storm Water Management Basins (2) Utility Main Relocations Acid Bearing Rock (ABR) – rock containing the sulfide-bearing mineral pyrite represents a potential source of Acid Rock Drainage (ARD). As a result, the construction specification required to minimize exposure to air and water without being covered to 5 days, and required an ABR disposal at the project’s approved waste site.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent magna tellus, eleifend sodales neque a, laoreet sagittis enim. Mauris sed eros vitae metus porttitor faucibus. Nulla facilisi. Vivamus ultricies diam id leo aliquam interdum. Quisque laoreet in velit id auctor. Mauris congue dolor vitae ligula feugiat, non consequat elit condimentum. Etiam vel consequat tortor. Fusce vitae mollis magna suspendisse finibus.